Abstract:According to the practice and study on the furnace maintenance of titanium-bearing pellets. It was confirmed in No.7 BF that the relationship between w[Ti] , titanium load and w[Si] in hot metal. To obtaining the suitable titanium load and integrated optimal control of w[Si], it should be on the first hand to determine the amount of titanium load for its bigger impact on w[Ti], and then adjusting w[Si] for its smaller impact. The effect on furnace maintenance is based on technologies such as increasing the cooling intensity and controlling the smelting intensity, which is a long period of effort with continuous adjustment.
李胜杰,龙防,程广田. 含钛球团矿护炉在安钢7号高炉的应用与研究[J]. 中国冶金, 2015, 25(05): 43-46.
LI Sheng-jie,LONG Fang,CHENG Guang-tian. Practice and study of the furnace maintenance of titanium-bearing pellets in No.7 BF of Anyang Steel. China Metallurgy, 2015, 25(05): 43-46.