Since Ansteel implement the strategy of low cost to run, the system of ironmaking around company’s requirements optimized the structure of sinter blending, optimized the burden structure of blast furnace, and improved sinter and lump ore’s ratio imported , reduced the proportion of expensive pellets imported that into the furnace. At the same time we have done a good of job in other areas of concentrate. With changes of the burden structure. we have taken a series of technical measures to maintain a long-term stability of the blast furnace, and have achieved low-cost ironmaking running.
周文刚, 苏永洪, 孙洪涛. 安钢9号高炉低成本炉料结构冶炼实践[J]. 中国冶金, 2012, 22(9): 38-41.
ZHOU Wen-gang, SU Yong-hong, SUN Hong-tao. Production Practice With Optimized Burden Structure of BF No.9 in Ansteel. China Metallurgy, 2012, 22(9): 38-41.