This paper introduces the technical innovation of Shougang Jingtang Steel Plant 5500m3 blast furnace BSK dome combustion hot stove. Ultra large dome combustion hot blast stove optimum technical process is integrated; high temperature 2 stage preheating technology of combustion air and dome combustion hot stove high-efficiency ceramic burner are developed; according to the characteristics of dome combustion hot blast stove, the rational structure of dome and ceramic burner are designed; high efficiency checker brick is adopted, the thermal specification and structure of regenerator are optimized; reasonable hot blast stove checker heating surface is determined. Hot blast stove proper lining design is optimized; the effective technical measures for hot blast stove shell inter-crystalline stress corrosion prevention is applied. According to the thermal conduction calculation of regenerator suitable hot blast stove refractory is configured; the refractory technical performance is improved additionally. Refractory structure design of hot blast pipe system is improved in order to meet the requirement of 1300 ℃ blast temperature. Blast temperature of design level is reached to 1300 ℃ monthly after blast furnace blow in.
张福明, 梅丛华, 银光宇, 毛庆武, 钱世崇, 胡祖瑞. 首钢京唐5500m3高炉BSK顶燃式热风炉设计研究[J]. 中国冶金, 2012, 22(3): 27-32.
ZHANG Fu-ming, MEI Cong-hua, YIN Guang-yu, MAO Qing-wu, QIAN Shi-chong, HU Zu-r. Design Study on BSK Dome Combustion Hot Blast Stove of Shougang Jingtang 5500m3 Blast Furnace. China Metallurgy, 2012, 22(3): 27-32.