太钢4 350 m3高炉非计划长期休风的成功恢复
唐顺兵
山西太钢不锈钢股份有限公司炼铁厂,山西 太原 030003
Successful Recovery of 4350 m3 BF After Non-Plan Long Time Blow Down
摘要 太钢4 350 m3高炉2010年2月28日因为炉顶中心喉管膨胀节跑煤气造成非计划休风18 h 50 min。此次送风恢复过程中视炉热水平,轻负荷料下达位置及炉况接受情况分三个阶段进行风量和富氧量的恢复。同时,通过适量多补充喷煤量,用足风温和安排合理的炉前作业等,实现了炉况的成功快速恢复。
关键词 :
高炉 ,
风量 ,
恢复 ,
喷煤 ,
炉前作业
Abstract :4350 m3 blast furnace of TISCO blowed down for 18 h and 50 min without plan on Feb.28, 2010, because the expansion joint in roof center pipe run gas. With a view to metal temperature,low burden load,s point of blast furnace and conditions of blast furnace, the blast rate and oxygen enrichment value were restored through 3 steps. The furnace conditions recovered successfully with more coal, enough blast temperature and reasonable operation of cast house, etc.
Key words :
blast furnace
blast value
recovery
pulverized coal injection
casting house work
收稿日期: 2010-09-01
出版日期: 2011-06-20
通讯作者:
唐顺兵
E-mail: tytgtsb@163.com
[1]
安波 ,岳强 姚应林,柯显峰. 基于低成本炼铁过程控制的研究实践 [J]. , 2014, 24(5): 35-39.
[2]
秦晓勇 ,刘雄 ,陈林根 ,孙丰瑞 . 高炉利用系数目标优化模型的研究与应用 [J]. , 2014, 24(4): 5-10.
[3]
张殿伟 ,赵志星,赵宝军. 首钢高炉渣与配制四组元渣的黏度研究 [J]. , 2014, 24(4): 11-15.
[4]
芦永明,田乃媛,贺东风,王丽娜,陈宏志. 全板带型钢厂高炉—转炉区段配置及其生产组织探讨 [J]. , 2014, 24(4): 45-50.
[5]
孟祥龙,张福明,曹朝真. 首钢高炉喷煤技术发展与创新 [J]. , 2014, 24(3): 21-26.
[6]
王冬青,马泽军,竺维春. 喷吹煤Y在首钢高炉的应用 [J]. , 2014, 24(3): 48-51.
[7]
周飞,俞金城,彭黎明. 安徽长江钢铁公司3号1080m3高炉喷煤设计特点 [J]. , 2014, 24(11): 58-62.
[8]
芮文杰,唐章富,刘向新. 邯钢2×60MW常规机组升级CCPP方案 [J]. , 2014, 24(10): 32-34.
[9]
李胜杰,张希刚,赵恒山. 安钢2号高炉经济块矿生产实践与成本分析 [J]. , 2014, 24(10): 39-41.
[10]
杜斯宏,宋剑,吴亚明,曾华锋. 攀钢钒新3号高炉年修开炉快速达产实践 [J]. , 2014, 24(1): 18-22.
[11]
邱国兴,殷忠力,朱化朋,姜智文. 提高煤气利用率降低高炉燃料比 [J]. , 2014, 24(1): 47-51.
[12]
高建军 严定鎏 齐渊洪 张俊 郭玉华. 氧气高炉风口前燃烧带数值模拟 [J]. , 2014, 24(09): 44-48.
[13]
唐小辉,刘润藻,李士琦,杨静波,肖宏,寿庆霞. 唐钢高炉瓦斯灰的提铁提锌试验 [J]. , 2014, 24(09): 49-52.
[14]
薛锴,刘新军,张宇晓,司晋利,董江峰,霍瑞霞. 高炉鼓风机高效安全运行措施的实践 [J]. , 2014, 24(09): 53-56.
[15]
姜华,蔡九菊. 高炉炉缸用后炭砖中脆化层的研究 [J]. , 2014, 24(09): 57-62.