Abstract:The rolling schedule of level 2 system of 1800 mm reversing mill in Tangsteel strip cold rolling plant is studied. Aimed at the loading distribution’s influence on flatness precision, systemic study on cold rolling model are proceeded. Optimal programme are compiled and it is carried out in practice.
李小敬,任吉堂,韩继征. 单机架可逆冷轧机轧制规程优化设计[J]. 中国冶金, 2008, 18(9): 27-27.
LI Xiaojing,REN Jitang,HAN Jizheng. Optimized Rolling Schedule of Reversing Mill Using Optimize Methods. China Metallurgy, 2008, 18(9): 27-27.