Abstract:The production line of Shasteel 6.5 万t/a iron and steel project is composed of three 2500 m3 blast furnace and three 180 t converters. In this project, with the design idea of “get the ladle done at one go”, the process of combining the hot metal ladle of the casthouse into one that for reladling to converter is realized. Thanks to this process, it cancels the hot metal ladle repairing devices of the ironmaking area and become easier due to no reladling operation step. It is good for the hot metal temperature protection and prevents the environment from pollution. This process has been made great benefits and approved practically after four years experienced operation.
张灵1 ,刘俭2 ,方音2 ,王卫东2 ,许茂清2 ,易银山1. 沙钢650万t钢板工程“一罐到底”的设计及生产[J]. 中国冶金, 2009, 19(2): 31-31.
ZHANG Ling1,LIU Jian2, FANG Yin2, WANG Weidong2, XU Maoqing2,YI Yinshan1. Design and Operation Process “Get the Ladle Done at One Go” for 6.5 万t/a Shasteel Iron and Steel Project. China Metallurgy, 2009, 19(2): 31-31.