Abstract:The trial production of first 2.0Mt grate-kiln oxidized pellet process in HANGANG and how to solve the problems met in trial are introduced, .Because of the satisfactory arrange and preparation, the design capacity was achieved only in 40 days. Trial also shows that using self-produced pellet, iron making is smooth operation, coke rate is lowered and production is increased.