Abstract:Some concept and practice on the upgrading and transform of the level 2 system for the CSP caster in HBIS Group Hansteel had been discussed. After investigation on the function and application of the original level 2 system, combined with the consideration of problem existing in the old system and the adaptation to the latterly installed information and automation system, the traditional caster level 2 system had been updated and extended, where the production, equipment and quality management requirement had been taken into consideration, and the maintenance workshop extension and key equipment on- line supervision had been realized. The innovation had been successfully accomplished with the above mentioned character.
李瑞生,赵艳良,罗北平,张瑞忠. 连铸二级系统升级及拓展的探讨与实践[J]. 中国冶金, 2018, 28(12): 60-65.
LI Rui- sheng,ZHAO Yan- liang,LUO Bei- ping,ZHANG Rui- zhong. Discussion and practice on upgrade and expansion of continuous caster level 2 system[J]. China Metallurgy, 2018, 28(12): 60-65.