Abstract:Shougang Jingtang Iron and Steel Plant has built the sintering plant with two 500m2 sintering machines at Caofeidian Port, whose overall design adopted advanced process technology and large-scale equipments, broke through long process flow layout in traditional metallurgical projects and realized short process flow with compact arrangement. Widening side plate of sintering machine and annular cooler were used to create conditions for increasing production capacity and lowering energy consumption of unit production. Since starting in May 2009, the equipment has been running smoothly with sintering bed depth of 830mm in sintering production. The qualification rate of sinter alkali reached 99.71% and the drum index was 81.79%. The process energy consumption was 47.70kg/t which was far less than that of domestic iron and steel enterprises and Posco Kuangyang, Korea at the same period,and reached first class level domestically and internationally.
王代军. 首钢京唐大型烧结机成功应用与烧结生产实践[J]. 中国冶金, 2014, 24(2): 30-35.
WANG Dai-jun. Application of Large Scale Sintering Machine and Production Practice at Shougang Jingtang. China Metallurgy, 2014, 24(2): 30-35.