Abstract:Before No.3 coiler of TISCO HSM was revamped ,the WDPF control system from WESTHOUSE corporation has been behind.Now TDC control system of SIEMENS corporation is applied and modified. The design, program and testing of this project were independently finished by TISCO. Some new technologies are used in this project:(1) optimizing control of strip head tension;(2) pinchroll tension control; (3) tension reduction control of coiler smoothness curve; (4)control of travel simulation limit and lifting/lowering simulation limit of strip car.
尹晓雷,黄小虎,王其峰,康炜. 太钢3号卷取机TDC控制系统开发与应用[J]. 中国冶金, 2006, 16(9): 35-35.
YIN Xiaolei,HUANG Xiaohu,WANG Qifeng,KANG Wei. Development and Application of TDC Control System in Coiler of Taigang. China Metallurgy, 2006, 16(9): 35-35.